Past Due Inspections
Past Due Inspections shows the list of requirements that were previously scheduled but which were not accomplished on or before the scheduled date. Items on this list will not be scheduled in the future unless an inspection is performed and input if the QA Plan is configured to "Use Auto-Adjusted Frequencies", if "Use Fixed Inspection Dates" is selected in the QA Plan the item will remain on the Past Due list for the number of day configured in the Contract Preferences' QA Plan, "Next Inspection Date Forwarding" function.
The number of Past Due inspections to display on the dashboard is configured in personal Preferences. In the example above it can be seen that preference is configured to display 10 Past Due Inspections.
Selecting "more -->" (bottom right of the Past Due Inspections dialogue box) will link to the Past Dues Inspections report where all Past Due Inspections are displayed and can be resorted and printed.